Friday, September 3, 2010

Big Booty Cartoon Pin-up

> DTS ANALYSIS

Below is an analysis of made by users Posterforum . Sent to the UM study so liked in the office of the 31.08 have been consulted on it. Because of the long nature - in short, what we propose:
  • tunnel extension - which is possible from a technical point of view
  • taking care of little architectural detail and quality
  • correcting certain conventions
  • higher density of buildings over DTS
  • symbolic of the former Canal COMMEMORATION KÅ‚odnica
It is possible that some of these demands can be achieved - if not immediately, for example, by such a strengthening of retaining walls of the excavation, in future, it was possible to extend the tunnel.
course presents the concept is only a review article, we believe the resulting development of space should be declared an architectural competition.

invite you to read.


visualization:


plan:

0 comments:

Post a Comment